Outdoor Areas

This faculty application, which has now been submitted, covers a range of work to improve safety and security around St. Paul's Church building.

Cellar Steps

The steps down to the cellar door are on the NE corner of the building.

Quotations from Quinquennial Report 2012:

Provide protective railings to the boiler house steps and introduce a handrail on one side fo the steps (Items which should be completed within the next 18 months).

Remove old fuel tank bund wall and make good to the paving. (Repairs which should be carried out during the Quinquennium)

Overhaul and repaint the railings to the E. boundary wall. (Items which should be carried out in the next 18 months.)

Pictures of the steps

(Click on a picture to zoom in)

A Picture of Cellar Steps looking SW from Montreal Street
A Picture of Cellar Steps looking SW from Montreal Street
A Picture of Cellar Steps close up


A Picture of Old fuel tank paving
A Picture of Paved area, with wall, and Montreal Street beyond
A Picture of Cellar Steps, looking from Montreal Street

Additional Information

Steps from the Community Garden

The steps are located at the SE corner of the church grounds.

Quotation from Quinquennial Report 2012:

Either close the southern boundary south-east corner gate so that it can no longer be used, or provide handrail guarding to the steps. (Items which should be completed in the next 18 months)



A Picture of Community Garden Steps 1
A Picture of Community Garden Steps 2


Additional Information: